Thurston Highlands - A Master Planned Community
Top of Navigation Bar
Home Page
Contact Us
Frequently asked questions
Newsletter
Outline of Process
Open House
Links
Consulting Team login below
Consulting Team login here

Draft EIS Files

DEIS and Technical Reports are Available for Review:

- At the June 25 and July 16 Open Houses
- On the City of Yelm website (www.ci.yelm.wa.us)
- At the Yelm Timberland Library
- At Yelm City Hall

Electronic versions of the DEIS and Technical Reports are available on CD at no cost by contacting the City of Yelm via email at highlands@ci.yelm.wa.us.

Printed copies can be obtained by placing individual orders with ABC Printing in Lacey at (360) 456-4545, or via email (dale@abcprinting.net). Persons who place printing orders will be responsible for printing costs.

Draft EIS Document Files (PDF)

Cover-June2008
CoverMemo 061008
FactSheet&TOC061008
1.0 Summary 061008

2.0 ProposalAltern061008
3.1 Earth 061008
3.2 AirQuality 061008
3.3 WaterResources 061008
3.4 Wetlands 061008
3.5 FishWildlife 061008
3.6 EnergyNatlRscs 061008
3.7 PlansPolicies 061008
3.8 LandUse 061008
3.9 Noise 061008
3.10 FtLewisEIS 061008
3.11 Population 061008
3.12 Housing 061008
3.13 LightGlare 061008
3.14 Aesthetics 061008
3.15 ParksRec 061008
3.16 HistoricCulturalRes 061008
3.17 Transportation 061008
3.18 PublicServices 061008
3.19 Utilities 061008
3.20 FiscalAnalys 061008

4.0 References 061008

5.0 DistributionList 061008

AppendixA-SustainableDev

AppendixB-StudentPopProj

Draft EIS Figures

Fig2.2-1-VicinityMap
Fig2.5-1PreferredAlternative|
Fig2.5-2-PreferredAltZoom-In
Fig2.5-6-Phase1ConceptualLandUsePlan
Fig2.6-1TraditionalDevelopmentAlt

Fig2.6-2-TraditionalDevAltZoom-In
Fig2.6-3UrbanVillageAlt
Fig2.6-4-UrbanVillageAltZoom-In

Fig3.1-01-11x17-SiteMap
Fig3.1-02-CrossSect_AA
Fig3.1-03-CrossSect_BB

Fig3.1-04-TestPitLocations
Fig3.1-05-SlopeConditions
Fig3.3-01-11x17-SurfaceWaterFeatures
Fig3.3-02-11x17-Feb20-1996-Inundation
Fig3.3-03-ThompsonCreekFlow
Fig3.3-04-ComparisonOfWaterSurfaces
Fig3.3-05-11x17-ChannelCapacitySchematic

Fig3.3-06-ProjectSpecificSubBasins

Fig3.3-07-11x17-ThurstonHighlandsGroundwaterFlow

Fig3.3-08-PrecipEvapoInfiltraSchematic

Fig3.3-09-11x17-ThurstonHighlandsModelArea
Fig3.3-10-ThompsonCreekSegmentation
Fig3.4-1-SurveyedWetlandsMap
Fig3.4-2-BoulevardWetlandCrossings
Fig3.4-3-H-ComplexWetlandBuffers
Fig3.4-4-MitigationCompensationSites

Fig3.5-1-SiteMapWithHabitatAreas
Fig3.5-2-WNDRStreamMapping
Fig3.5-3-WestBoundaryWildlifeFence

Fig3.10-1-RelationshipoftheSitetotheFortLewisMilitaryReserva
Fig3.17-1-RelationshipoftheThurstonHighlandsSitetotheReigion
Fig3.17-2LocalStudyArea

Fig3.17-3RegionalStudyArea
Fig3.17-4-2012Network1Baseline
Fig3.17-5-2015Network2Baseline
Fig3.17-6-2025Network3Baseline
Fig3.17-7-2012Phase1-Local
Fig3.17-8-2015Phase2Local
Fig3.17-9-2012Phase1Regional
Fig3.17-10-2015Phase2Regional

Fig3.17-11-LocalArterialRoadwayCapacityLocation

Fig3.18-1YelmFireDistrict

Fig3.18-2PoliceProtectionAreas

Fig3.18-3SchoolDistricts

Fig3.18-4TAZ-Zones

Fig3.19.1-1WaterSystemMap
Fig3.19.5-1-Power-GasFacilities

Technical Reports, Figures and Appendices

DEIS-TechnicalReportsCover-June2008

Aesthetics-Oct07-v3-print


AirQualityAssessment-Mar08-v2-print

FiscalAnalysis-Apr08-print


FishWildlifeReport-Apr08-print

FishWildlife Fig1 prt11x17
FishWildlife Fig2 prt
FishWildlife Fig3 prt11x17
FishWildlife App II prt
FishWildlife App III prt
FishWildlife App IV prt
FishWildlife App V prt

GeotechnicalReport-Feb08-print
GeotechRpt Fig1 prt11x17
GeotechRpt Fig2 prt11x17
GeotechRpt Fig3 prt11x17

GeotechRpt Fig4 prt11x17
GeotechRpt Fig5 prt11x17
GeotechRpt Fig6 prt11x17
Geotech App A prt
Geotech App B prt
Geotech App C prt
Geotech App D prt

GradingDrainageUtilitiesRept-May08-print
Fig 1.1-VicinityMap prt11x17
Fig 1.2-ExistingCond prt11x17
Fig 1.3-AerialPhoto prt11x17
Fig 2.1-ExistingSlope prt11x17
Fig 4.1-WaterSystem prt11x17

Fig A.1-PrefAlt prt11x17
Fig A.2-TradAlt prt11x17
Fig A.3-UrbanVlgAlt prt11x17
Fig A.4-PropPhase1 prt11x17
Fig B.1-SoilLogs_Infiltration prt11x17
TH-Site-SoilLogs prt
Fig C.1-ProjectSpecificSubBasins prt11x17
AppD-SustainableDev prt
AppE CalcMethod prt
E-1 PrefAlt-DrainageCalcs prt
E-2 TradDevAlt-DrainageCalcs prt
E-3 UrbVillAlt-DrainageCalcs prt

Fig F.1-TahomaBlvdSect prt11x17

InfiltrationEffectsReport-May08-print
Infiltration Fig1-SiteMap prt 11x17
Infiltration Fig2-GroundwaterFlow prt 11x17
Infiltration Fig3-XSectionsAA-BB prt 11x17
Infiltration Fig4-XSectionCC prt 11x17
Infiltration Fig5-GWModelArea prt 11x17
Infiltration Fig9-PrecipEvap prt
Infiltration AppA LithologicLogs prt
Infiltration AppB WaterLevelData prt
Infiltration AppC SoilTestLabsRpt prt
Infiltration AppD AntecedentPrecipitation prt
Infiltration AppE SimulationResults prt

LightGlare-Oct07-print

ParksRec-Oct07-print

SurfaceWaterEvaluationRpt-May08-print
SW-Fig 1-SW Features prt 11x17
SW-Fig 8-Channel Capacity prt 11x17
SW-Fig 10-Jan 1997 Inundation prt 11x17
SW-Fig 11-Feb 1996 Inundation prt 11x17
SW-Fig 12-Tahoma Terra Br Wetland prt 11x17
SWEvaluation-AppA prt
SWEvaluation-AppB prt

TransportationImpactAssmt-Mar08-print
Transportation ES Fig1
Transportation ES Fig2
Transportation ES Fig3
Transportation ES Tbl1
Transportation ES Tbl2
Transportation Fig1
Transportation Fig2
Transportation Fig3
Transportation Fig4

Transportation Fig5

Transportation Fig6
Transportation Fig13
Transportation Fig14
Transportation Fig15
Transportation Fig16
Transportation Fig17
Transportation Fig18
Transportation Fig19
Transportation Fig32
Transportation Tbl8 11x17
Transportation Tbl9 11x17

Transp AppA-TrafficCounts

Transp AppB-VolumeForecasts

WetlandInventoryReport-Apr08-print
WetlandInv Fig1 prt11x17
WetlandInv Fig2 prt11x17
WetlandInv Fig3 prt11x17
WetlandInv Fig4 prt
WetlandInv Fig5 prt
WetlandInv Fig6 prt11x17
App II Soil Data Shetsprt
App III CategoryRatingForms prt

 

Updates to the Project Schedule

June 9, 2008
Draft EIS complete
and distributed

June 10, 2008
Public comment period begins

June 25, 2008
Open House
5-8pm at Yelm High School

July 16, 2008
Open House
5-8pm at Yelm High School

July 28, 2008
Public comment period ends

Summer/Fall 2008
Final EIS preparation

Fall 2008
Begin review process of the updated Master Site Plan application

 

 

Rendering of Thurston Highlands Community
Copyright 2007 Thurston Highlands Associates, LLC
Page Bottom